1. Site Assessment
Sub-Stage | What This Means |
Welcome Call | Your Project Manager will call to introduce themselves, explain the next steps, and make sure we have everything needed to move forward. |
Site Assessment | A Technician visits your home to measure the roof, check electrical equipment, and gather all information needed for engineering and system design. You'll get a two-hour arrival window for this appointment. |
2. Design & Engineering
Sub-Stage | What This Means |
In Design | Our design team reviews all Site Assessment data, evaluates shading, checks your roof layout, and creates your solar design and engineering documents. |
3. Approvals
Sub-Stage | What This Means |
Ready for Approvals | Your Project Manager prepares and sends a Customer Approval Packet (CAP) and will review your final system design with you. |
CAP Complete | You have approved your system design, any necessary changes have been made, and your project can proceed. |
Pending R&I | We're working with your jurisdiction, utility, and any other authorities for required rebate and utility interconnection approvals. Some agencies take longer than others -- we follow up at least once per week. |
4. Scheduling
Sub-Stage | What This Means |
Install Ready to Schedule | Your project has all required approvals and is officially ready to be placed on the installation calendar. |
Install Date Requested | Our Field Operations team is reviewing your project and offering available installation dates. Your Project Manager will confirm the date with you. |
5. Installation
Sub-Stage | What This Means |
Installation Scheduled | Your installation date is locked in! Your Project Manager will confirm everything you need to know for install day. |
6. Inspection
Sub-Stage | What This Means |
Installation Completed | Your solar system has been installed. Now, we review photos for quality and prepare for inspection. |
Inspection Requested | We've requested a final inspection for your new solar system. This timing varies depending on inspector availability. |
7. Permission to Operate (PTO)
Sub-Stage | What This Means |
Inspection Completed | Your system has passed inspection, and we're sending required paperwork to your utility company. |
PTO Submitted | All documentation and paperwork has been sent to your utility company for permission to energize (turn on) your system. |
8. Closeout
Sub-Stage | What This Means |
PTO Approved | Your utility company has granted Permission to Operate (PTO.) Your system is now officially allowed to run and produce power. |
System Activation | Your Project Manager activates your system remotely and ensures your monitoring is online and functional. |
9. In Service
Sub-Stage | What This Means |
In Service | Your project is complete! Any future needs will go through our Customer Support Team, and they can answer questions or create service tickets for you anytime. |
System Activation | Your Project Manager activates your system remotely and ensures your monitoring is online and functional. |